St37.2 St44.2 St52.3 ERW Welded Carbon Steel Tube

St37.2 St44.2 St52.3 ERW   Welded Carbon Steel Tube

Component I: Item INTRODUCTION
one. Commodity: Welded or ERW carbon steel tube
2. Dimensions selection: 8*.8-eighty*three for round tube
three. Obtainable metal grade: 

ASTM: MT1571, MT1571, 1571, 1571
DIN:  ST37.two,ST44.two,ST52.three
EN:  E195, E215,E235,E355, 
GB:  Q195, Q235,Q345

4. Manufacture method: ERW
five. Supply situation: CR1,CR2, +A,+N
6. Finish finish: Plain finishes with square cuts, cost-free of burrs.
7. CZPT export packing: In bundles tied with steel strips. Int&ext oil coating. Finish plastic caps. Exterior packing by PVC luggage and knit baggage. 
8. CZPTized packing and marking can be presented on request. 

Portion II: Frequently Questioned Queries
1. MOQ:
3-five tons/size
two. Supply Time: fifteen-45 days depending on availability of raw material in inventory.
3. Guarantee&Guarantee: Warranty&promise period of time is 6 months since we supply the tubes, and we are not accountable for good quality issue caused by mistaken unloading or storage soon after cargo. We welcome customer’s inspection before shipment. 
4. Payment Technique: We acknowledge payment method like T/T, L/C, or D/P, but it depends on our investigation about buyers. We have a solution to appraise the credit history of consumers from all above the globe, and time and amount of D/P we can release is decided by the evaluation. 
five. Good quality Handle: We buy raw materials from steady suppliers who are top metal mills, and we inspect the uncooked substance as per the specifications. In the course of our production treatment, there is inspection and top quality manage in each stage. 

Part III: Organization INTRODUCTION
We are a manufacturer of cold drawn, chilly rolled, and hydraulic chilly drawn metal tubes with OD upto 356mm since 2002. Covering an region of about 32000M2, we have twelve normal workshops with 2 hydraulic cold drawing benches, 4 chain cold drawing benches, and 2 ERW mills. Our services covers all the manufacturing processes from pickling, cold drawing, warmth managing, observed slicing, straightening, inspection, packing to additional machining &turning, chilly drawing die fabrication, and gear repairation&servicing. 

Manufacturing facility Look:

ERW WORKSHOP:

ERW ASSEMBLY LINE:

ERW ASSEMBLY LINE:

Upkeep&Repair WORKSHOP: 

ERW MODULE WAREHOUSE: 

 

St37.2 St44.2 St52.3 ERW   Welded Carbon Steel Tube